Industry summary
The IEA’s 30 October analysis examines wildfire exposure in electricity-grid planning.
INNOFLOW interpretation
For projects near vegetation, add a route-review checkpoint before ordering equipment. Ask the project designer to record the chosen route, alternatives considered and the local information used. Assign responsibility for updating that review when site conditions change. A global risk map alone cannot determine a site's equipment specification.
INNOFLOW
Wildfire risk: add a route review before electrical procurement